Pile load test procedure pdf merge

Pile head the pile head shall be chipped off till sound concrete is met wherever applicable. Review of foundation testing methods and procedures author. The capwap eod and pda eod methods underestimated static pile capacity because the pile. Comparison between dynamic and static pile load testing. The test pile is loaded using a calibrated hydraulic jack that applies the test load to the pile by pushing against a. Test pile and load test details the pile et4 is a bored pile drilled on december 15, 2014 stabilization of the u pper portion of the borehole, in diameter was used. Description of method low strain integrity testing may be applied to any concreted pile e. Hoy, texas highway department this paper covers the general principles of pile load testing, including objectives of pile testing, importance of planning, various types and methods. Pdf in recent decade, dynamic load test is increasingly being used for pile load testing. The reinforcement shall be cut and head levelled with plaster of paris. Design and construction of driven pile foundations. Sep 03, 2017 transmission line axial uplift load test on foundation. The goal of the research was to perform 7 static axial load tests at 7 locations to compare results with.

Numerical values of partial factors for limit states from pile load tests to be. Chancecivil construction historical perspective 1st recorded screw pile was by alexander mitchell in 1836 for moorings and then applied by mitchell to maplin sands. A bearing plate with a hole shall be placed on the head for the jack to rest. Side shear f and end bearing q combine to resist the top load. Pile load test the procedure for the pile load test shall be as follows. Note 2 guidance on analysis procedures for dynamic load testing results is given in annexes a, b, d, e and f. Pile capacity predictions using static and dynamic load testing. The objectives of this paper are to examine the different methods used in interpreting pile load test results and choose the most reliable method for interpreting the results of the tests for piles in egyptian soil. Aug 11, 2017 consists of arrangement, methodology of pile load test. The mass with the coiled springs is dropped onto an anvil resting atop the test pile.

Pdf the static pile load test on a single pile involve uplift force, axial compression and lateral tests when applied. The piles should be loaded to at least two times the design load, and preferably to failure. Aft provided the testing services for the project dynamic, static, statnamic, and acell. This test is standardized by astm d5882 standard test method for low strain impact integrity testing of deep foundations. Standard test methods for deep foundations under lateral load1. Load tests vary in their procedure, equipment, instrumentation, and load application methods. The load test procedure is expected to take less than 6 hours during which time no other construction. The ibc code is the law but is not as popular as using. Measure these distances between the test pile face and the nearest face of the cribbing supports. This online engineering pdh course describes various load test procedures, equipment, instrumentation and objectives. The test plate shall have side dimensions not more than, and not less than one half of, the diameter or side dimension of the test piles. Pile load tests are then carried out to refine and finalize the design.

At the site of significant movement of an adjacent building. Pile load tests with constant penetration rate and cyclic load tests are not covered by this standard. Cementation foundations skanska ltd, hertfordshire, uk test equipment has been developed to record automatically both the displacement of the pile head and the load applied during a conventional maintained load pile test. A summary of the results can be found in a presentation made to aldot at the 62nd annual. Load movement measurements and failure load determination load movement measurements a typical setup for an axial compression static load test is presented in figure 1. For high capacity piling tests, much heavy manual effort is saved. Review of foundation testing methods and procedures. A greater spacing between the cribbing supports and test pile or reference system may. Pile load tests including quick load test method, conventional methods, and interpretations frank m. Static pile load testing is one of the most common methods for testing the actual insitu capacity of a pile.

In general two types of pile load tests are conducted. Design and construction of driven pile foundations lessons learned on the central arterytunnel project chapter 4. A comparison between the different methods of interpreting pile load test results is made to. Remedial action may include pressure grouting through core holes. Test pile preliminary pile design is first carried out on the basis of site investigations, laboratory soil testing, and office study. Objective this test is used to determine the load carrying capacity of a pile. The top elevation of the load test pile shall be determined immediately after driving and again just before load testing to check for heave. The testing of pile will be carried out according to the lndian standard is. If the pile top appears questionable, further pile top cutoff and retesting may be advisable.

Abcarius the october 17, 1989 loma priet a earthquake provided an ideal time and situation to perform for the first time, at no installation cost, a full scale lateral load test on a group of driven piles in typical bridge footings at the cypress street viaduct. In a dynamic load test, the weight of the ram is typically between 1% and 2%. Numerical values of partial factors for limit states and of correlation factors to derive characteristic values from static pile load tests to be taken into account in design are. Fullscale load testing of 57year old raymond piles for. The test for static load slt contains the direct calculation of pile head displacement with regards to a concretely functional test load. If a majority of piles diagnose as inconclusive, partial. In accordance with the relevant provision of the indian standard ls. Verification of pile load capacity using static pile load test. The test pile, installation equipment and installation procedure should be identical to that intended to be used for production piles to the extent practical. Pile maintain load test mlt a building or structures soundness starts with a strong foundation, especially the piles. Pile load test values of driven piles were compatible with shear strength values given by curve 2. Pile load test hpcl, visakh toyo engineering india ltd.

Midroc foundation specialist has been performing pile load testing on the different projects that it has executed to date and is still the leading service provider in the country incorporating the latest technological advancements in the construction industry. This test gives us the value of ultimate load value safe load value settlement under different values. The postinstallation dynamic load testing procedure is typically performed under impacts of. Planning of pile load test setup should starts from the design office.

Test results may also provide information used to assess the distribution of side shear resistance along the pile shaft, the amount of end bearing developed at the pile toe, and the longterm loaddeflection behavior. The load carried by the pile is the combine effect of. Pdf comparison of static and dynamic load test of pile. The compression test piles were load tested in general accordance with astm d1143, with a final test load of 200 percent of the 889. Standard test methods for deep foundations under lateral. Pile load test procedures can change slightly from region to region depending on the local building codes. Transmission line axial uplift load test on foundation. Analysis dynamic analysis load test on pile penetration tests load test on pile. Foundation contractors that are part of a concessionaire team pursuing the project were allowed to bid the load test program.

When a pile is driven, the soil surrounding the pile would be remolded. After unloading, the test pile was loaded to 2,668. Lateral load test site c they are two for the price of one. Pile load tests including quickload test method, conventional methods, and interpretations frank m. This case study provides details of the excavation and dewatering issues, load test setup, and the difficulties. Dynamic and static pile load test data this chapter presents the methodology and results of dynamic and static pile load test data for the selected contracts. This paper describes the ocell bottomup method for the static load testing of bored piles and. Allowable load tension load based on bolt strength. Capwap analysis is made on the pda data after the test is complete.

Design, testing and automated monitoring of acip piles in. Static pile load tests on driven piles into intermediate. Pile dynamic load test pda live step by step procedure. This test is performed to confirm the design load calculations and to provide guidelines for setting up the limits of acceptance for routine tests. The problem is discussed for combining static and dynamic fault trees with event tree separately. Comparison of static and dynamic load test of pile.

It presents various procedures for stresscontrolled and straincontrolled type of load tests. Test results may also provide information used to assess the distribution of side shear resistance along the pile shaft, the amount of end bearing developed at the pile toe, and the longterm load. Initial test on piles are to be carried out at one or more locations depending on the number of piles. A pile load tester can only be used to evaluate compression pile capacities.

Federation of piling specialists handbook on pile load testing. It is the most basic method of pile load test and is treated as the critical point of pile performance. Dynamic load testing is a high strain dynamic test which can be applied after pile installation for concrete piles. Although the top load static test is the reference test against which all other tests methods are. Pdf verification of pile load capacity using static pile load test. The test plates shall span across and between any unbraced. Therefore, the following test procedure is based on the quick load test method for individual piles. The initial test is performed before the start of construction to assess the design adequacy. Sixtyfour continuous flight auger piles were tested using the maintained load test. Axial load test procedures for pile foundations introduction because of the nonavailability of reliable procedures for assessing the load transfer mechanisms between piles and surrounding soil, or for determining the ultimate capacity of piles, fullscale load tests are conducted. Codes of deep foundations stipulate the acceptance criteria for. Isodis 224771en, geotechnical investigation and testing.

Dynamic pile load test procedure is standardized by astm d494500 standard test method. This test procedure shall be considered to meet the minimum requirements for load testing. Jay patel120280106037 naman kantesaria120280106039 udit patel1202801060 applied mechanics departement 2. En iso 224771 shall be used in conjunction with en 19971. Cut off or build up the test piles as necessary to permit construction of the loadapplication apparatus, placement of. For steel or timber piles, dynamic load testing can be done during installation or after installation. This test gives us the value of ultimate load value safe load value settlement under different values of loads 3. Measurement of lateral movement of pile top a primary and a secondary monitoring system and an inclinometer shall be used by the. The procedure is standardized by astm d494500 standard. The load test results showed that the piles have more capacity than what they were designed for. Pdf assessing the pile base capacity from a static load test on. Federation of piling specialists handbook on pile load testing10 foreword this handbook was published in march 2006 by the federation of piling specialists fps to provide guidance on the principles and practical issues that relate to load testing of bearing piles, and thereby to assist informed decisions about testing. Dynamic load testing of driven piles may be performed during the pile driving process, andor.

For this test method, a large mass is dropped on top of the test pile. In a static load test, the load applied to the deep foundation element is measured. The procedure is standardized by astm d494500 standard test method for high strain dynamic testing of piles. Pile properties soil properties assigned soil parameters test pile d ei drill type n n n dw su f g gavg f kh zp dpit mm kn mm2 method min max typ.

Dynamic load testing services what is dynamic load testing. In initial test, the test load 52 times the working load in work test load is 32 times the design load. The osterberg cell and bored pile testing loadtest. Combine with the existing clay calibration chamber with minimal modifications. Pile load tests, in practice, are normally executed in two alternative ways. Recommendations regarding the most reliable and economical load test methods needed by. Axial load test procedures for pile foundations pdh. This study provides a new procedure for static pile driving simulations, reveals the influence of static pile. Pile dynamic load test pda live step by step procedure methodology working pile test drop hammer.

For larger load test exceeding 3000 tonnes, the project team can consider using steel plates, tension piles or ground anchors as the reaction load or adopting other alternative method of testing like bidirectional load test. When the final depth was reached, the bottom of the borehole cleaned using the same bucket used for dril the instrumented cage was placed used to pour the concrete in the borehole. One load test was undertaken on a belled pile end bearing in glacial clay till and a second load test on a straight pile socketed in weak clay shale bedrock. Sample specification for pile integrity testing by the low strain impact method. The test program involves the direct measurement of pile head displacement in response to a physically applied load. As a part of foundations quality assurance, maintain load test, also known as static load test is necessary to ensure the pile that was driven could take the design load of the structure. Transient response frequency domain analysis procedure. Astm d1143 d1143m 0720e1 standard test methods for. Pdf comparison between dynamic and static pile load testing. It is not intended to preclude local building codes, which may require the use of other testing methods as described in the astm specifications.